What Do the 112th Street Improvements Mean for Lakewood Residents?
What Do the 112th Street Improvements Mean for Lakewood Residents?
Location and reporting date: Lakewood, Washington | July 21, 2026
Lakewood’s active 112th Street SW project is adding sidewalks, bike lanes, curb and gutter, streetlights, and radar feedback signs between Farwest Drive SW and Holden Road SW. The work creates temporary weekday travel disruptions, but the completed project is intended to improve pedestrian access, visibility, and road safety along this Lakewood, Washington corridor.
The City of Lakewood is currently working on one of those projects that can be frustrating during construction but meaningful after the cones disappear.
The active section of 112th Street SW runs between Farwest Drive SW and Holden Road SW in Lakewood, Washington. According to the City of Lakewood’s July 16 through July 23 construction update, the street is closed during weekday work hours from 7:00 a.m. to 4:00 p.m. Crews have been installing curb and sidewalk improvements and preparing for bike-lane paving.
For nearby homeowners, buyers, and sellers, the project matters for two separate reasons. First, it affects current travel and property access. Second, the finished improvements may change how people experience the corridor on foot, by bicycle, and behind the wheel.
What is being added to 112th Street SW? 🚧
The project is adding five principal safety and access features: curb and gutter, sidewalks, bike lanes, radar feedback signs, and streetlights.
The Lakewood City Council approved the construction contract in spring 2026. The City lists the current project cost at $1 million. As of the City’s July 16 update, sidewalk had been poured on the south side, curb work had been completed on the north side, and crews were preparing for additional sidewalk and bike-lane paving.
These are practical improvements rather than decorative ones. Sidewalks create a defined place for pedestrians. Bike lanes separate bicycle travel from the main vehicle lane. Streetlights improve nighttime visibility. Radar feedback signs show approaching drivers their speed, which can encourage slower driving without pretending a blinking number is a magic wand.
Where is the active Lakewood construction happening?
The active project is on 112th Street SW between Farwest Drive SW and Holden Road SW in Lakewood, Washington.
The corridor is within ZIP code 98499. Gravelly Lake K-12 Academy, part of Clover Park School District, is located at 5504 112th Street SW. That school address helps anchor the location, but buyers should not assume that every nearby property has the same school assignment. Attendance boundaries depend on the exact address and should be verified directly with Clover Park School District.
This part of Lakewood also sits within the broader street network connecting residents to Gravelly Lake Drive SW, Bridgeport Way SW, Lakewood Towne Center, Interstate 5, and other destinations throughout the city. The active work zone, however, is specifically the Farwest-to-Holden segment. It should not be confused with other 112th Street projects listed in Lakewood’s larger capital-improvement program.
How long will weekday traffic be affected?
The City’s current update lists weekday closures from 7:00 a.m. to 4:00 p.m. during the July 16 through July 23 work period.
Construction schedules can change because of weather, materials, utility coordination, inspections, and field conditions. Residents should check the City of Lakewood Capital Projects page before relying on an older closure notice.
People who live near the project should also confirm how local access is being handled for their particular driveway or side street. A posted detour can tell you how through traffic moves, but it may not answer every property-specific access question.
Why do sidewalks, bike lanes, and streetlights matter? 🚲
They matter because a street is more than pavement between two intersections.
A corridor without complete sidewalks can be difficult for pedestrians, people using mobility devices, parents pushing strollers, and anyone trying to reach a nearby destination without driving. Bike lanes can provide a clearer travel path for cyclists. Streetlights and speed-feedback signs can improve visibility and make drivers more aware of their speed.
The City of Lakewood identifies the 112th Street project as a road-safety improvement. That is the verified public purpose. It would be too strong to promise that the project will eliminate speeding, prevent every collision, or transform every nearby block. Infrastructure can improve the design of a corridor, but driver behavior and ongoing enforcement still matter.
Will the project increase nearby Lakewood home values? 🏡
The project may improve the corridor’s usability, but it does not automatically increase the value of every nearby home.
Buyers often notice sidewalks, lighting, street condition, traffic, noise, ease of access, and proximity to schools or commercial areas. Those factors can influence how a property compares with competing homes. However, real estate value is also shaped by the specific house, lot, condition, floor plan, parking, immediate surroundings, recent comparable sales, and current buyer demand.
There can also be tradeoffs. Some buyers appreciate improved access and transportation options. Others may focus on traffic volume, construction inconvenience, or how close a house sits to the roadway. A responsible market analysis should evaluate the exact property rather than attaching a generic “road-project premium” to every home in ZIP code 98499.
What should Lakewood buyers look at near 112th Street SW?
Buyers should evaluate both the finished project and the property’s exact relationship to the corridor.
- Visit at different times of day to understand traffic and noise.
- Confirm driveway access and parking.
- Review whether the house fronts 112th Street SW or sits on a nearby side street.
- Check current construction notices and planned future projects.
- Verify school assignments directly with Clover Park School District.
- Review permit, utility, drainage, and property-boundary information.
- Compare the home with recent sales that have similar roadway exposure.
The goal is not to label the project as good or bad. The goal is to understand how the location works for that buyer’s daily routine and how the property compares with other available choices.
What should Lakewood sellers disclose or explain?
Sellers should provide accurate information about known access issues, active construction, and property-specific conditions without guessing about the project’s completion date or future financial impact.
A seller can point buyers toward the City of Lakewood’s official project page. That is better than offering a confident prediction based on something heard from a neighbor three driveways down.
Marketing should focus on verified features. If the finished corridor provides a sidewalk, bike-lane connection, new lighting, or improved access relevant to the property, those facts may be useful. Sellers should not promise that the project guarantees appreciation, lower traffic, or a particular commute time.
What information should be independently verified? ✅
Construction schedules, detours, local access, school assignments, property impacts, and future plans should be independently verified before a buyer or seller relies on them.
The project details in this article were checked on July 21, 2026. The City’s construction update covered July 16 through July 23, 2026. Because field schedules change, residents should review the City of Lakewood Capital Projects page for the newest notice.
Buyers and homeowners should independently confirm:
- Current closure hours and detour routes
- Driveway and local-access arrangements
- Future phases of work
- School attendance boundaries
- Property lines and right-of-way
- Drainage, utilities, permits, and easements
- Property-specific market value
Frequently Asked Questions About the 112th Street Project
Where is the active 112th Street project in Lakewood?
The active project is on 112th Street SW between Farwest Drive SW and Holden Road SW in Lakewood, Washington. It is one of several Lakewood transportation projects, so residents should confirm they are reading the update for the Farwest-to-Holden segment.
What improvements are being installed on 112th Street SW?
The City of Lakewood lists curb and gutter, sidewalks, bike lanes, radar feedback signs, and streetlights as the principal improvements for the Farwest-to-Holden project.
When is 112th Street SW closed for construction?
The City’s July 16 through July 23, 2026 update lists weekday closures from 7:00 a.m. to 4:00 p.m. Construction schedules can change, so residents should check the City of Lakewood Capital Projects page for the latest notice.
How much does the 112th Street safety project cost?
The City of Lakewood lists the project cost at $1 million. That figure applies to the active Farwest Drive SW to Holden Road SW safety-improvement project described in the City’s current update.
Which school district serves Lakewood, Washington?
Clover Park School District serves Lakewood and Joint Base Lewis-McChord. The assigned school depends on the exact property address, so buyers and residents should confirm attendance boundaries directly with the district.
Will the road project raise my Lakewood home’s value?
No automatic increase can be promised. Improved sidewalks, lighting, bike access, and street condition may influence buyer interest, but a home’s value depends on its exact location, condition, lot, features, comparable sales, and current competition.
What is the practical takeaway for Lakewood residents?
The 112th Street project is a real, active investment in pedestrian access, bicycle infrastructure, lighting, and driver awareness. The temporary inconvenience is also real.
For homeowners and buyers, the useful approach is to separate today’s construction impact from the long-term design of the corridor. Review the official updates, visit the location, and evaluate the exact property instead of making a decision from a headline.
If you are buying or selling near 112th Street SW or elsewhere in Lakewood, Washington, I can help you compare the property, the roadway exposure, nearby competition, and the practical tradeoffs without pushing you toward a predetermined answer.
I’m Aaron Miriello with Prime Northwest Homes, brokered by eXp Realty. Real estate. Relationships. Results.
Sources
Categories
- All Blogs (85)
- Agent (3)
- Appraisal (1)
- Buyers (24)
- Educational (4)
- Escrow (1)
- FHA (3)
- Financing (4)
- First time homebuyer (6)
- Home Buying Criteria (3)
- Homeowners (6)
- July 2026 Market Update (1)
- Lakewood, WA (1)
- Loans (2)
- Market Conditions (21)
- Miscellaneous (4)
- Mortgage Rates (1)
- Multiple Offers (2)
- NAR (1)
- Negotiation (2)
- Offers (2)
- Pierce County (1)
- School Districts (1)
- Sellers (28)
- Selling (33)
- Staging (3)
- Tips (11)
- Title (1)
- Utilities (4)
- Videos (1)
Recent Posts









GET MORE INFORMATION


